59. MRH15-01-Jan2015-L - page 105

structures. John estimates that there are over 200 buildings on
the layout, in addition to all of the supporting detail. Modeling
an urban scene requires a lot of buildings, and John has either
built or used pieces of nearly all of the urban structures avail-
able for industries, as well as buildings used in supporting
roles. A number of the structures are scratchbuilt, using a wide
variety of materials. Anyone familiar with downtown Cincinnati
will quickly recognize many of the industrial buildings that were
around in the mid-1970s. John has built replicas of these using
photographs from that time period.
Operation
For John, the ultimate reward for all of his efforts is seeing the
layout in operation. It takes between 12 and 15 people to fill
KANAWHA & LAKE ERIE |
23
23. A view of the main K&LE freight station on the near west
side of downtown Cincinnati.
KANAWHA & LAKE ERIE |
24
24. A Southern Railway transfer run makes its way toward Plum
Street Yard on its way to Undercliff Yard.
25. An L&N transfer run moves through QC Interlocking on its
way to Undercliff Yard.
1...,95,96,97,98,99,100,101,102,103,104 106,107,108,109,110,111,112,113,114,115,...152
Powered by FlippingBook