57. MRH14-11-Nov2014-L - page 132

STEP 5: Gluing the internal cap detail
Continued ...
16. Place the section so the top part of the styrene
piece is flush with the actual gap. Be sure all
of the caps are lined up across the face of the
building.
16
Hiding modular seams - 9
STEP 5: Gluing the internal cap detail
Continued ...
17. Align the sections using the modular brickwork
as a guide, and a metal ruler as a final check.
17
MRH-Nov 2014
1...,122,123,124,125,126,127,128,129,130,131 133,134,135,136,137,138,139,140,141,142,...168
Powered by FlippingBook