the two outside walls of the layout room, while studs were
erected for the two inner walls. Drywall was placed on the
layout side only, for the time being.
Once again we received a lot of help. Hobbyists from the
Kitchener-Waterloo area, and a few from farther afield helped
with all this work. Several have since become members of the
group. A family member who had experience tinsmithing installed
12. The finished control room. Each desk controls a
section of the railway, as described in the text. Each
monitor is connected to two cameras, which gives the
operator of that area good top-down views of areas
where there are uncoupling magnets, or hard-to-see
switch locations.
12