continued to add small items, as we saw fit. We ran two sets of
shows each year: two weekends in May, and three in October/
November. Throughout our time in Aberfoyle, we had great
help from many friends in general construction, model-build-
ing, and running our shows.
The control system Chuck designed was standard DC. The
throttles were variable transformers, the AC being rectified
after it became low-voltage. There were six operating posi-
tions in the tower. Two controlled each of the CNR’s double-
track mainline. Two controlled the CPR, and two took care of
7. The interior of the St. Jacobs building as the model
railway group took possession.
7
Aberfoyle Junction - 6
MRH-Dec 2014