Our cityscape, and the town of Westport had been built on ply-
wood, so these pieces could be salvaged, making the rebuilding
of these townsites go faster.
One of our members had access to a 16’ box van. We decided
to cut the layout sections into pieces as close to this length
as possible, though there were many smaller pieces as well.
All the legs were numbered, so we’d know where to replace
them. Most of the cuts were made with a Sawzall. Prior to any
8. Early September, 2012, and the train room is almost
complete. At this point, HVAC ductwork, lighting
fixtures, and cameras are being installed above the
T-bar ceiling.
8