31. After cutting the Lego
part in half, a flat piece
of 0.010” styrene was
glued on the cut face
with ACC. Two 0.020” by
0.040” horizontal strips
were glued per photos of
the prototype. A second
piece of 0.010” styrene
was glued to the bottom
and sanded to the same
contour.
31
32
32. This side view of the
elevator distributor head
shows the legs that were
installed, and the Rix
Products circular piping
inserts glued to the base.
Rix Products distributor
piping would later be glued
in each insert.
Agway Feed Mill - 16
MRH-Sep 2014