53. MRH14-07-Jul2014-L - page 82

14. The scribed floor is mounted to the card base to
bring it up to the height of the railhead.
15. The base with the rails is set in place to confirm
the alignment of the approach rails and to check the
clearances of the tracks on both side of the structure.
16. I placed the workbenches in the structure and made
sure that I had proper clearance for the locomotives.
16
15
14
Building a two stall engine house- 8
MRH-Jul 2014
1...,72,73,74,75,76,77,78,79,80,81 83,84,85,86,87,88,89,90,91,92,...157
Powered by FlippingBook