18
19. The temporary cleats (left and above) with the first
piece of backdrop installed. The first 3’ of the sec-
ond layer has been glued in place behind this. I drove
screws from the other side into the six scraps of wood
to pinch the two layers of backdrop together for a stron-
ger lamination.
19
Cleats added below
the subroadbed as
additional mount-
ing surface for the
backdrop
Up the Creek Column - 12
18. Screw blocks added below the roadbed edge provide
a good anchor for the bottom of the backdrop sheets.
MRH-Jul 2014