49. MRH14-03-Mar2014 - page 204

The ceiling paint helps keep dust from sifting down from above,
the plastic sheets keep dust from the concrete basement walls
out of the layout space, and the stain on the floor sealed it. The
layout accumulates very little dust thanks to these construc-
tion precautions. Next I installed the electrical outlets and track
lights, and hung drywall in the staging room, workshop, and
around the walls of the layout room. All layout room corners
were coved (curved) using 1/8” Masonite.
The track lights originally used small 60-watt “fan bulbs” in
the cans. I have 100 cans, for a total of 6000 watts of light (all
Pennsylvania & Western RR -
8
13: Your 2-10-2 has uncoupled from the train and prepares to
take water in the shadows of the Annville industrial district.
The yard switcher will pull forward and take the crossover in
the foreground to work your train.The Annville yard office is
on the left.
13
MRH-Mar 2013
1...,194,195,196,197,198,199,200,201,202,203 205,206,207,208,209,210,211,212,213,214,...295
Powered by FlippingBook