49. MRH14-03-Mar2014 - page 214

21: A Pennsy T1 4-4-4-4 drifts into Lebanon station with a
passenger train.The passenger station is on the left and the
freight house is across the tracks in this photo.
21
within reach of the aisles are manually operated by Caboose
Industries ground throws.
The railroad has an operating signal system with PRR-style
position-light signals. I designed the detection circuits myself,
and there are 45 relays that drive 26 signal heads. Occupancy
detection in 3-rail is really easy, by the way. The three rails are
all electrically isolated from each other. The middle rail is “AC
hot” and one of the outside rails is “AC common.” The other
outside rail is available for the signal system to use.
On 3-rail cars and locomotives, the wheels are not insulated
from each other. Whenever any piece of rolling stock is in
a block, the wheels and axle make an electrical connection
between the “AC common” rail and the signal system’s rail.
Pennsylvania &Western RR - 1
3
MRH-Mar 2013
1...,204,205,206,207,208,209,210,211,212,213 215,216,217,218,219,220,221,222,223,224,...295
Powered by FlippingBook