49. MRH14-03-Mar2014 - page 213

20: The cabin car on EC-11 is about to enter the tunnel
leading to Pittsburgh and Conway Yard staging.
20
There is no central control panel. Rather, I built small panels
into the layout fascia wherever they are needed (mostly for
switch and electromagnetic uncoupler control in local switch-
ing areas, and to control the staging yards).
There are five power districts on the railroad, each supplied
with 16 volts AC at 10 amps. The main power bus wires are 10
gauge solid copper house wires. Track block connections use
stranded wire from 12 to 16 gauge, depending on the length of
the run. There are transformers under that layout that supply
power for switch machines, uncoupling electromagnets, acces-
sories, lights, signals, and relays.
The switch machines in Annville Yard are all Tortoises with
LED indicators on the yard control panels. Some other hard-
to-reach turnouts have twin-coil machines, but turnouts
1...,203,204,205,206,207,208,209,210,211,212 214,215,216,217,218,219,220,221,222,223,...295
Powered by FlippingBook