46.MRH13-12-Dec2013-L - page 96

Locking up your layout - 14
30
31
32
30: When IAIS 708 is clear of the points, the
conductor will close and lock the points before
running down the siding to the south switch.
31: Locking and unlocking equipment is just as
much of a conductor’s job as is coupling and
uncoupling freight cars.
32: Back on the running track, the Tramp is ready
to couple back with its train for the shove north to
Grimes.
MRH-Dec 2013
1...,86,87,88,89,90,91,92,93,94,95 97,98,99,100,101,102,103,104,105,106,...153
Powered by FlippingBook