35. MRH13-01-Jan2013-P - page 185

-
STEP 14: Final Assembly
Continued ...
To build the small conveyor that sits at the top of the
tower, start by cutting two pieces of 3/64” channel to a
length of 10 scale feet. For the rollers, cut two 2’ pieces if
1/8” styrene tube. Glue the first piece to the end of one
of the pieces of channel and glue the second one 2 1/2’ in
from the other end- see the photo above for the location
of the various pieces.
Next, glue the other piece of channel to the other side of the
pieces of 1/8” tube. The rollers should be centered on the
channel pieces. For the platform for the motor, cut a piece of
.010 sheet styrene to the width between the channels and a
length of 1 3/4 scale feet and glue it the end of the channels
away from the rollers (described on next page).
The electric motor (see 43a) is from Williams Brothers but
you could substitute something similar from your scrap
43a: Mounting the conveyor bents.
43a
1...,175,176,177,178,179,180,181,182,183,184 186,187,188,189,190,191,192,193,194,195,...279
Powered by FlippingBook