            STEP 11: Preparing the Assembly Base
          
        
        
          
            Continued ...
          
        
        
          enough roomwhere the large conveyor meets the breaker for
        
        
          the roof of the large conveyor to extend in under the breaker
        
        
          roof. Once you are satisfied with the position of the conveyor
        
        
          and tower, glue the tower to the base.
        
        
          At this point I placed a small strip of .060 styrene on top of the
        
        
          last two roof brackets at the conveyor end and let it extend
        
        
          over the tower- see the photo above. Be sure that the con-
        
        
          veyor is placed in the right location, both on the tower and at
        
        
          the base. If it isn’t, the measurement for the height of the end
        
        
          brackets will be incorrect.
        
        
          For the end roof brackets, measure the distance from the
        
        
          edge of the tower to the bottom of the piece of .060 styrene
        
        
          and cut two pieces of 3/64” angle to this length. Glue them in
        
        
          place as shown in the photo. Cut a piece of scale 2 x 6 to the
        
        
          width between the two angles, glue it in place and paint the
        
        
          angles and cross brace with the rust color used previously.
        
        
          Now that this last piece of the roof bracing is in place, we can
        
        
          measure the full length of the roof for the large conveyor.
        
        
          
            37
          
        
        
          37: The
        
        
          conveyor
        
        
          and roof
        
        
          bracing.