 
          
            -
          
        
        
          
            STEP 11: Preparing the Assembly Base
          
        
        
          
            Continued ...
          
        
        
          5” piece of .060 styrene for the base. Position the receiving
        
        
          bin, breaker, conveyor and conveyor tower on the base and
        
        
          then mark the areas outside of the basic structure. Cut these
        
        
          away and you’ll have a base that looks like the one in the
        
        
          photo above.
        
        
          I realized at this point that I would need to add the ground
        
        
          cover under the breaker and the receiving bin prior to glu-
        
        
          ing them to the base. And before I could add the ground
        
        
          cover, I needed to install some base supports for the breaker
        
        
          and the large conveyor. In the photo here (35), the breaker
        
        
          is resting on two lengths of .040 x .040 styrene cut to the
        
        
          width of the structure and glued to the base at either end.
        
        
          In order to elevate the large conveyor so that it would rest
        
        
          inside the breaker, I cut a piece of hydrocal from a retaining
        
        
          wall that I had left over from another project and glued it in
        
        
          place with epoxy. As a result of raising the end of the large
        
        
          conveyor at the breaker, the support bents for the conveyor
        
        
          were now too short.
        
        
          I added a piece of .060 styrene to the styrene base along the
        
        
          length of the conveyor as shown in the photo here (35) in
        
        
          order to solve this problem.