56.MRH14-10-Oct2014-P - page 156

farther forward than a standard SD45. Follow photos to glue
the air tanks in the right position.
The moisture ejectors on the rear of the air tanks are fragile
and can be easily broken off. To make them stronger, drill #80
holes and insert pieces of .010” wire as shown in [29]. Next
trim off the pieces of wire so they are flush. In this photo you
will also see the truck air cutoffs from the Details West detail
kit. One of these is glued above each truck with the front one
under the right side sill and the rear under the left. I found
these parts to be quite fragile and accidentally broke them off
several times. Eventually I decided to leave them off so you will
not see them in later photos.
Add the air filters from the Details West detail kit. Shorten the
smaller filter as shown in [30], drill a #79 hole in the top, and
make a new mounting pin from a short length of .012” brass
wire. I tried using the air piping from the detail kit as well but,
did not have much luck with it. I decided to bend the air piping
27
27. Cannon steps and Details West buffer plate
installed.
Pan-Am Railways SD45R - 13
MRH-Oct 2014
1...,146,147,148,149,150,151,152,153,154,155 157,158,159,160,161,162,163,164,165,166,...349
Powered by FlippingBook