44. MRH13-10-Oct2013-P.pdf - page 241

Here I enter Engelhard Kaolin Shipping in the Name and put in
Engelhard siding, Gordon, GA in the comments and click on the
Add Schedule button.
Next I select Tank Kaolin as the car type and click on the Add
car type button. Once I have everything selected I click on Save
Schedule and close the window. Then, in the Edit Siding Track I
select the schedule I just created, click on the Save Siding Track
button, and close that window. I repeat the process to set up
a receiving schedule in Eugene, and I am done with this car.
This takes much longer to talk about than it does to do it. It is
almost the same process used setting up a car card and waybill
system for this car and these industries.
10: Completed route screen. Even though the SP runs
north and south along the West Coast, northbound
trains are considered eastbounds by the railroad.
10
1...,231,232,233,234,235,236,237,238,239,240 242,243,244,245,246,247,248,249,250,251,...317
Powered by FlippingBook