its banks look modelable in the space I have (10). As a bonus
there are lots of covered highway bridges in the area (12). I'm
hoping to model one of these (8) .
A minor mainline track realignment will let me bring the river
(or creek) an inch closer to the aisle, allowing a wider river/
creek or moving the tracks in Albany Junction closer to the aisle
for improved switching access.
What's next?
Cutting out some of the roadbed for Bear Creek yard and a
few other places was a good break from trackwork. It also paid
12: One of several covered highway bridges near
Albany, Oregon.
12
Up the Creek Column - 7
MRH-Jul 2013