41. MRH13-07-Jul2013 - page 61

control panels to assign blocks, progressive cab control uses
track detectors to automatically assign blocks based on loco-
motive direction and turnout positions.
Occasional informal operating sessions were run on the layout
under this control system but I was always limited to running no
more than two trains at a time. The system could be expanded
to accommodate
dozens of trains
at a time but I
never installed
the additional
circuit boards to
do that.
With only two
trains running at
a time, opera-
tions were lim-
ited to each
operator mak-
ing up a train at
one of the two
terminal yards,
and passing each
other some-
where in the
middle of their
runs.
In 1997, I
rewired the
layout for DCC
and installed
1...,51,52,53,54,55,56,57,58,59,60 62,63,64,65,66,67,68,69,70,71,...237
Powered by FlippingBook