59. MRH15-01-Jan2015-P - page 217

hold. Now that these projects
are complete, John looks for-
ward to more frequent operat-
ing sessions. Future projects
include the installation of a
full CTC system. John and
several friends are installing
signals on the layout. The
ultimate goal is to be able to
have the dispatcher control
the layout using CTC. There’s
more scenery to finish in a
number of areas, more struc-
tures will be needed as well,
38. Train #101- Monongah, WV to St. Louis, MO – stopped at the
east end of FR Interlocking. He has just set-out and picked up
several cuts of cars at Undercliff Yard.
KANAWHA & LAKE ERIE |
32
1...,207,208,209,210,211,212,213,214,215,216 218,219,220,221,222,223,224,225,226,227,...303
Powered by FlippingBook