55. MRH14-09-Sep2014-P - page 173

handling required, I held off adding the Tichy railings and lad-
ders until the elevator and silos were completed. Once the
walls were built and window openings cut, I assembled each
wall with Evergreen .250” x .250” styrene at each corner for
bracing.
Feed bin
The feed bin was the most difficult part of the structure con-
struction, my delaying tactics before construction involved
thoroughly researching photographs for suitable scratchbuild-
ing supplies to achieve the desired look. As the prototype pho-
tos illustrate Bernardston Mill [4], the bin is constructed of
9. Assembled main structure including office addition,
viewed from the north.
9
1...,163,164,165,166,167,168,169,170,171,172 174,175,176,177,178,179,180,181,182,183,...307