50. MRH14-04-Apr2014 - page 142

18: The lower
quadrant train
order semaphore
atOakhill.
TheOakhill
operator has set
theeastward
semaphoreblade
to stop (up/
horizontal)while
copyinganorder
for aneastward
train. Thisensures
the trainwon’t
pass the station
before theorder
canbeprepared.
TamValleyDual
3-way
servocontrollers and
tinyR/Caircraft servosoperate the semaphoreblades.
Thesecontrollerseven includebladebounce!
18
20: Plywoodhengeas it appeared inDecember, 2014.
Once thebackdropgoesup, itwill bedifficult, though
not impossible, for operatorsoutside thehelix table to
see their trains.
BearCreek&South Jackson-1
5
MRH-Apr2014
1...,132,133,134,135,136,137,138,139,140,141 143,144,145,146,147,148,149,150,151,152,...301
Powered by FlippingBook