STEP 14: The Running Boards
55
55: I begin by cementing
the eye-bolt at the
corner of the roof grab
iron. I have found that
it much easier to install
these using this process.
The key is to use the
method that works best
for you.
56: Holes were
drilled at the proper
distances and then
the corner grabs were
installed. A piece of
4” styrene was used
as a spacer to insure
that the grabs were
set at the proper
height.
56