40. MRH13-06-Jun2013 - page 247

STEP 14: The Running Boards
55
55: I begin by cementing
the eye-bolt at the
corner of the roof grab
iron. I have found that
it much easier to install
these using this process.
The key is to use the
method that works best
for you.
56: Holes were
drilled at the proper
distances and then
the corner grabs were
installed. A piece of
4” styrene was used
as a spacer to insure
that the grabs were
set at the proper
height.
56
1...,237,238,239,240,241,242,243,244,245,246 248,249,250,251,252,253,254,255,256,257,...295
Powered by FlippingBook