53. MRH14-07-Jul2014-P - page 161

The clerestory roof has been completed, and the pigeons
have taken up home already [13]. The bottom row of shingles
shows the start of the individual shingle lifting. Again , this is
a long and tedious job, but the end result is worth the effort.
As I have always said, what you put into building a model will
always show in the final product.
Adding the floorboards
Next I started on the floor, using the individual boards ([14]
and [15]) per the kit instructions. After much debate, I opted
13. This is the almost completed roof. A little more
weathering and the chimney needs to be added. I have
also added the upper windows and tilted them out so
the smoke dissipates for the shop crew.
13
1...,151,152,153,154,155,156,157,158,159,160 162,163,164,165,166,167,168,169,170,171,...313
Powered by FlippingBook