 
          The clerestory roof has been completed, and the pigeons
        
        
          have taken up home already [13]. The bottom row of shingles
        
        
          shows the start of the individual shingle lifting. Again , this is
        
        
          a long and tedious job, but the end result is worth the effort.
        
        
          As I have always said, what you put into building a model will
        
        
          always show in the final product.
        
        
          
            Adding the floorboards
          
        
        
          Next I started on the floor, using the individual boards ([14]
        
        
          and [15]) per the kit instructions. After much debate, I opted
        
        
          13. This is the almost completed roof. A little more
        
        
          weathering and the chimney needs to be added. I have
        
        
          also added the upper windows and tilted them out so
        
        
          the smoke dissipates for the shop crew.
        
        
          13