53. MRH14-07-Jul2014-P - page 170

I placed the castings in what I thought should be their cor-
rect positions, then checked to see that the locomotives
– Heislers and Shays, cleared the castings. The wedge plow
just makes it past.
Once I fixed the floor in place and temporarily placed the
engine house in position to make sure everything fit correctly, I
drilled holes through the layout for the lighting wires.
Adding windows, doors, details, and animation
With the positioning finalized, I removed the building and
weathered it inside and out. This is where I glued the final pieces
of the building – the center post between the two front doors,
21
21. The lights create a nice warm glow for the night
crew as they ready one of the locomotives for the next
day’s work.
Two stall engine house- 12
MRH-Jul 2014
1...,160,161,162,163,164,165,166,167,168,169 171,172,173,174,175,176,177,178,179,180,...313
Powered by FlippingBook