44. MRH13-10-Oct2013-P.pdf - page 47

Because the track was already ballasted where the sema-
phore would be installed, I used a steel scraper to remove
enough ballast to make a flat mounting surface for the sema-
phore base (6). After scraping, I test fit the semaphore to be
sure its base would fit. I also
wanted to be sure there was
adequate clearance between
the semaphore and passing
railroad equipment (7).
6: Scraping away ballast near the hole to make room for
the semaphore's base.
6
7: Test fitting the sema-
phore's base. Does it
rest level with no ballast
chunks below?
7
1...,37,38,39,40,41,42,43,44,45,46 48,49,50,51,52,53,54,55,56,57,...317
Powered by FlippingBook