Virginia Southwestern - 11
17: View of lower, mid
and upper level plywood
decking in place on the
framework. The sub
roadbed is 3/4” plywood
with 1/2” Homasote over
it. At this point I realized
that this might be a good
time to lay the staging
yard trackage before
access became difficult.
17
18: This is the plywood
decking for the lower
level L&N and Southern
south staging yards.
18
16
16: Another shot of
helix A showing track
exits at the lower level
at the far right, the
mid level at the left
and right part way up,
and upper level in the
center top.
Sub Roadbed
MRH-Sep 2013