43. MRH13-09-Sep2013-L - page 67

Virginia Southwestern - 17
Finished Scenery
40: L&N ALCO C420's 1302 and 1300 are moving
emptys through Blue Jay interlocking past Anndean
Industries Joyce Ann #3 loadout. Compare this with
photo 25.
40
41: L&N ALCO C420's 1300 and 1302 are busy
working Cawood spotting empties at Wilson Coal Co.
crush and load tipple.
41
42: J.R Roberts
Mining's fast
loader and coal
stack located at
Eljobean. The
tower the left
services the surge
stack, allowing
the mine to keep
on operating even
if there are no
hoppers available
for loading.
42
43: Even though J.R Roberts Mining's coal preparation
plant is a sprawling facility, all of the rail operations are
located at the the fast loader.
43
MRH-Sep 2013
1...,57,58,59,60,61,62,63,64,65,66 68,69,70,71,72,73,74,75,76,77,...147
Powered by FlippingBook