Virginia Southwestern - 11
17: View of lower, mid
and upper level plywood
decking in place on the
framework. The sub
roadbed is 3/4” plywood
with 1/2” Homasote over
it. At this point I realized
that this might be a good
time to lay the staging
yard trackage before
access became difficult.
17
18: This is the plywood
decking for the lower
level L&N and Southern
south staging yards.
18
16
16: Another shot of
helix A showing track
exits at the lower level
at the far right, the
mid level at the left
and right part way up,
and upper level in the
center top.
Sub Roadbed
20: Here we can see
all three levels with
plywood and Homasote
decking as the work
progresses. The track
has been laid on the
lower level staging
yard. If you look closely
at the vertical posts you
will see numbers on
them that correspond
to locations plotted on
the layout drawing.
20
19: More progress on the layout. The sub roadbed
is in place for the town of Goodbee on the right and
Cawood on the left. L&N and Southern staging yards
are below each of these towns.
19
MRH-Sep 2013