conveyors, most of which
I’ve been able to use at other
facilities.
The conveyor transfer struc-
ture is where coal from the
tunnel under the coal pile is
moved over to the main con-
veyor feeding the fast loader.
This structure was scratch-
built using Evergreen #273
H-columns, and #273 and
#274 I-beam. Evergreen .020”
x .060” styrene strips make