important changes were made to the main preparation build-
ing. First, I changed the orientation of the preparation build-
ing 90°. This move allowed moving the primary coal feed from
what was originally the left end of the building to the tower
area. The second change was moving the processed coal con-
veyor to exit the side of the building rather than the end. The
main crusher building was rotated 180° from its former orien-
tation. I was able to reuse some of the scratchbuilt conveyors
at this site. As a side, note the original facility had over 8’ of
14. View of the rear of
the loader, showing the
control room.
15. The bin in place.
14
15