58. MRH14-12-Dec2014-P - page 185

(d) When a Rule 43 restriction is located at a single mile point, one
green signal will be displayed to identify the restriction and may be
displayed to either side of the track.
(e) When a rail break has been detected by an engineering employee
and it is safe to operate over the break at a speed less than posted
speed, the RTC will provide GBO protection to affected movements
stating the authorized speed over the break and how such location
is marked in the field, by either a Rail Break Sign or foreman, at the
break. Flags required by Rule 843 will not be in place.
(f) The regular placement of flags as required by Rule 843 must be
utilized after twenty four (24) hours if the defect is continuing.
845. SIGNAL PLACEMENT MULTI-TRACK
Except on a subdivision desig-
nated in special instructions,
signals required by Rules 842
and 843, must be placed to
the outside of the outermost
track(s) and not between the
main tracks.
1...,175,176,177,178,179,180,181,182,183,184 186,187,188,189,190,191,192,193,194,195,...315
Powered by FlippingBook