20. Part of the stair jig is this section I made to hold
the stringers while the treads are cemented to them.
This fixture is a must, as it is almost impossible to
cement the treads to the stringers without it.
21. The finished stairs.
A little clean-up and
painting, and they are
ready to be added to the
structure.
Windows and doors - 11
20
21
MRH-May 2014