50. MRH14-04-Apr2014 - page 207

STEP8:The roof
22
22:Measure the exact widthof the roof from the
peak to the eave; onmymodel it is 16mm. Cut the
roof segments to thiswidth. Glue two segments
end-to-end.When dry, cut this piece tomatch
the length of the body, allowing for a very slight
overhangon the ends. Glue a roof support (1/8"
square stripwood) along the eave edge of the roof
sheet. Set it back from the edge 1.6mm.
23: Glue another support strip along the peak edge
of the roof segment. Offset this one about 1/8”
from the edge. It will need to clear the one added
to the peak of the opposite roof section.
23
1...,197,198,199,200,201,202,203,204,205,206 208,209,210,211,212,213,214,215,216,217,...301
Powered by FlippingBook