41. MRH13-07-Jul2013 - page 176

The Erie Railroad boxcars 4 -
4
STEP 16: Assembly and Further Details
Continued ...
65: The frame
and underbodies
of 75082 and
76246 are both
ready to have
their trucks
installed. I drilled
and tapped for
#2-56 screws to
hold the trucks
in place.
66: Next
the
running
boards
were
cemented
to the
roof. After
the main
running
board was
cemented,
I added
the corner
pieces, trimming the legs as needed to fit. After
the corner pieces were installed, I cut the running
board end brace legs to a length of 14” and
cemented them in place.
65
66
MRH-Jul 2013
1...,166,167,168,169,170,171,172,173,174,175 177,178,179,180,181,182,183,184,185,186,...237
Powered by FlippingBook