Getting Real Column - 19
36
36: In this front view, a strip of the Northeastern siding
has been cut and applied above each sliding door as a
track, and the Kintner sign is now applied. It too was
glued to thin styrene and applied to the building front
with double-stick tape.
Remaining work includes determining the best way to build
and apply the chutes, but I think I have some thinwall brass
channel that may do the job. I’ll likely cut slices into the siding
and foam core, and simply insert the channel. I also need to
add one more piping detail to the rear of the structure, and of
course paint the grain bin. My goal is to have the entire com-
plex, along with a small diorama board, ready to display at the
New England Prototype Modeler Meet in Collinsville, CT. on
May 31st. and June 1st.
See the following site:
.
Until then, Stay Real!
MRH-May 2013
1...,47,48,49,50,51,52,53,54,55,56 58,59,60,61,62,63,64,65,66,67,...153