Getting Real Column - 7
12: Even at this relatively late stage of constructing the
town, you can see I’m still using the mock-up. This is
despite the arrival of all of the other buildings in town
that Rich Cobb built for me. Clearly it was time to get
moving on the actual Kintner Milling.
12
13: My first task was to get comfortable with the site
layout and dimensions. Here you see that I’ve marked
the grain bin, the dumping pit (the wood you see is the
lauan plywood roadbed ready for track) along with an
excavated area for the “input-output” building, and the
footprint of the elevator to be built.
13
MRH-May 2013