 
        
        
          2 turn helix
        
        
          1.6%/1.5%
        
        
          Siskiyou staging (51)
        
        
          sector plate
        
        
          -2.8%
        
        
          (45)
        
        
          access
        
        
          access
        
        
          (51.5)
        
        
          -1.8%
        
        
          (53)
        
        
          (50)
        
        
          (63)
        
        
          (61)
        
        
          1.3%
        
        
          swing gate
        
        
          (48.25)
        
        
          gravel
        
        
          2.7%
        
        
          (63)
        
        
          (48)
        
        
          1.9%
        
        
          logunloading
        
        
          (49)
        
        
          (48.5)
        
        
          2.7%
        
        
          2.7%
        
        
          (53)
        
        
          main
        
        
          entrance
        
        
          (50)
        
        
          log loading
        
        
          warehouse
        
        
          (63)
        
        
          15" turntable outline
        
        
          depot
        
        
          (48)
        
        
          (53)
        
        
          (48.25)
        
        
          (53)
        
        
          (50)
        
        
          (53)
        
        
          depot
        
        
          helper pocket
        
        
          lap siding
        
        
          cold storage
        
        
          ice
        
        
          Vogue
        
        
          access
        
        
          MillBend
        
        
          OakHill
        
        
          Albany Jct
        
        
          JunctionCity
        
        
          (49)
        
        
          (49)
        
        
          Browning
        
        
          0.5%
        
        
          stagingunder peninsula (36)
        
        
          1.4%
        
        
          lumber loading
        
        
          log pond
        
        
          toSalem /
        
        
          Portland
        
        
          2.7%
        
        
          ToDeschutes branch
        
        
          (lower deck)
        
        
          (53.5)
        
        
          caboose trk
        
        
          ice trk
        
        
          mt storage
        
        
          Toledo branch
        
        
          tool track
        
        
          plywood
        
        
          bulkoil dealer
        
        
          depot
        
        
          Deschutes Jct
        
        
          BCSalvage
        
        
          depot
        
        
          team
        
        
          South
        
        
          Jackson
        
        
          bulk oil
        
        
          timbers loading
        
        
          team trk
        
        
          depot
        
        
          (51)
        
        
          (51)
        
        
          (48)
        
        
          (48)
        
        
          ag supply
        
        
          cannery
        
        
          (48)
        
        
          BearCreekYard
        
        
          toAlbany,
        
        
          Corvalis,Toledo,
        
        
          SP connection
        
        
          bulk oil
        
        
          SantiamRiver
        
        
          team track
        
        
          diner
        
        
          flourmill
        
        
          gas
        
        
          stores
        
        
          warehouse
        
        
          cold storage
        
        
          steel fabricating
        
        
          steel fabricating
        
        
          steel fabricating
        
        
          team track
        
        
          ag equipment dealer
        
        
          machine shop
        
        
          building supply
        
        
          caboose trk
        
        
          house trk
        
        
          toKFalls /
        
        
          Pocatello
        
        
          runaround
        
        
          printer
        
        
          spur into building
        
        
          S. Jackson
        
        
          switch lead
        
        
          trees
        
        
          lift
        
        
          up
        
        
          hatch
        
        
          Click
        
        
        
          to download
        
        
          the BC&SJ trackplan.
        
        
          installed and thoroughly tested before they're covered by the main
        
        
          level track work on the peninsula. The main level plans include:
        
        
          Bear Creek yard – the main yard on the layout. This yard will
        
        
          dwarf South Jackson and will have house track, depot
        
        
          track, main, two arrival/departure tracks, eight class tracks,
        
        
          a thoroughfare track, a separate empty car yard, ice plat
        
        
          form for reefers, and a massive engine service facility. I
        
        
          anticipate needing a yardmaster, two switch crews, and a
        
        
          motive power hostler in Bear Creek.
        
        
          Junction City – a switching area including industrial spurs.
        
        
          Albany Junction – a town on the Toledo branchline.
        
        
          Browning – an agricultural center town area.
        
        
          Other high-priority tasks are getting the South Jackson turntable
        
        
          installed and operating, and working on the main level of the pen-
        
        
          insula. Somewhere in there a full height backdrop needs installa-
        
        
          tion, too.
        
        
          Wahoo! I can't wait, but there's one heck of a lot of work to be
        
        
          done before the Bear Creek has its golden spike ceremony and we
        
        
          get to start full operations.