37. MRH13-03-Mar2013-P - page 198

I have designed the layout using Atlas Right Track software. The
track components can be laid out with the centerlines marked,
the cork roadbed laid out, and the track glued down on top of
the cork. The only gaps needed at this point are double gaps on
both tracks off of the wye as it’s a reversing section. The DPDT
switch will then be used to flip the polarity as this creates a
reversing section on the layout. The turnouts will be controlled
by installing the Caboose Industries ground throws. The throt-
tle can then be connected to the track to provide power.
4
4. Build the frame.
Western Expansion Central -
4
$500 Starter Layout Contest Rules
Here are the rules for the $500 Starter Layout Challenge Contest we ran from
August to November of 2012.
You have a $500 total budget.
Assume basic tools: hammer, saw, drill, screwdriver, scissors, single-edged
razor blades, soldering iron.
MRH-Mar 2013
1...,188,189,190,191,192,193,194,195,196,197 199,200,201,202,203,204,205,206,207,208,...283
Powered by FlippingBook