 
        
        
        
          It’s been about three years since the “Sea Trial” session, and
        
        
          about two years since I pressed the “reset” button. I’m pleased
        
        
          to report considerable progress has been made at putting
        
        
          things back together. All the benchwork, trackwork, and wiring,
        
        
          with the exception of the south end staging yard, is in place.
        
        
          And, with the trains running again, I’m planning on hosting a
        
        
          “Sea Trial” session in the next few weeks. And, in a few places I
        
        
          even managed to rough in some scenery (Fig. 8)
        
        
          So that’s the story of the somewhat painful journey of how I
        
        
          ended up with a layout that’s right for me, and how I changed
        
        
          course midstream to produce a layout that’s a perfect fit. I
        
        
          think the layout now offers a wide variety of wonderful model-
        
        
          ing projects based on a favorite prototype, can provide a lot of
        
        
          fun for as many as six people, but still be operable by one or
        
        
          two folks as mood, and availability, indicates.
        
        
          
            Then and now
          
        
        
          The following photos show the layout in its double-deck 2008-
        
        
          2010 configuration compared with a photo taken from the same
        
        
          location as the layout appeared during the tracklaying phase in
        
        
          early 2013.
        
        
          
        
        
          
            More photos on the next pages ...