57. MRH14-11-Nov2014-P - page 264

STEP 5: Gluing the external cap detail
16. Place the section so the top part of the styrene
piece is flush with the actual gap. Be sure all of the
caps are lined up across the face of the building.
18
Hiding modular seams - 10
MRH-Nov 2014
1...,254,255,256,257,258,259,260,261,262,263 265,266,267,268,269,270,271,272,273,274,...335
Powered by FlippingBook