57. MRH14-11-Nov2014-P - page 252

STEP 1: Layout the sections
6. Line up the sections and glue them together so
they are square and plumb.
6
Once you decide on the final design of your
modular wall, take care to align the wall sections.
This will ensure that the gap between the vertical
sections is as small as possible, and that the gap
is hidden when the decorative cap is installed.
Hiding modular seams - 4
MRH-Nov 2014
1...,242,243,244,245,246,247,248,249,250,251 253,254,255,256,257,258,259,260,261,262,...335
Powered by FlippingBook