55. MRH14-09-Sep2014-P - page 96

37. A receiving notch
was cut into the 2” pink
foam holding up the
previously built hillside,
to receive the pink foam
board that would sup-
port Laceyville.
38. Once the foam board
was down, I added a layer
of 2” florist’s foam and
began to position the
houses on this street. Note
the prototype photos in the
foreground. I took those
on a visit to Laceyville with
an eye towards locating
each house in terms of
37
1...,86,87,88,89,90,91,92,93,94,95 97,98,99,100,101,102,103,104,105,106,...307
Powered by FlippingBook