49. MRH14-03-Mar2014 - page 116

What’s neat column - 3
3: Sunrise. This is simply a good moment combining quality
engineering in the model with a little nature for a stunning photo.
3
track to match the photo, then tracing the mountains on
foam using the train’s roof as my height guide, worked out
really well.
By documenting the whole construction process, from foam
to wrapped black oak sides, to the built-in electronics and
blocks, I have what will eventually turn out to be a two-hour
video sharing the whole process of construction, photogra-
phy and operation with prototype photos and models from
Blackstone
(
). This month’s video
and stills are born from this four-week adventure into RGS
modeling. I put together about 20 runbys on six different
MRH-Mar 2013
1...,106,107,108,109,110,111,112,113,114,115 117,118,119,120,121,122,123,124,125,126,...295
Powered by FlippingBook