47. MRH14-01-Jan2014-P.pdf - page 76

48: Peco makes some
very handy turn-
out templates that
are a free download
from their website. I
planned to use a mix of
code 70 and code 83
track and turnouts in
this area, since I really
needed a few of Peco's
curved #8 turnouts.
Yet I was connecting
with an area that was
all done with code
70 track and Micro
Engineering turnouts.
Getting Real Column - 6
48
Time for Sub-Roadbed
Finally with all of the backdrop work completed I could begin
trackwork. I wasted no time hoisting the piece of 3/4" birch
plywood back on top of the risers and planning my trackwork
for East Towanda and Towanda Yard.
MRH-Jan 2014
1...,66,67,68,69,70,71,72,73,74,75 77,78,79,80,81,82,83,84,85,86,...245
Powered by FlippingBook