46.MRH13-12-Dec2013-P - page 87

24: Here's the new alignment.
25: The new bridge location crosses a double door
opening on 1.25” square aluminum tubing with hard-
board sides and is easily installed and removed with the
wooden sockets I built.
26: Since the old staging yard construction of so-so ply-
wood on metal shelf brackets would be unsuitable for
modern construction standards (and holding a lot more
weight due to the elevator location), I decided to rip it all
out and start fresh with top quality ¾” birch plywood, my
current standard.
26
1...,77,78,79,80,81,82,83,84,85,86 88,89,90,91,92,93,94,95,96,97,...305
Powered by FlippingBook