46.MRH13-12-Dec2013-P - page 190

Locking up your layout - 14
30
30: When IAIS 708 is clear of the points, the
conductor will close and lock the points before
running down the siding to the south switch.
31: Locking and unlocking equipment is just as
much of a conductor’s job as is coupling and
uncoupling freight cars.
32: Back on the running track, the Tramp is ready
to couple back with its train for the shove north to
Grimes.
MRH-Dec 2013
1...,180,181,182,183,184,185,186,187,188,189 191,192,193,194,195,196,197,198,199,200,...305
Powered by FlippingBook