 
          
            10
          
        
        
          Up the Creek Column - 6
        
        
          
            9
          
        
        
          9: Joe Fugate is intent on bringing train BCHE safely
        
        
          down the 2.8% grade from Oakhill toward Tunnel 3.
        
        
          Behind Joe is the very first piece of the main deck
        
        
          roadbed on the peninsula.
        
        
          10. Jim B. (left) is the Redland local switch crew
        
        
          tonight. Jim M. (middle) and Mike B. (right) are the
        
        
          Deschutes Hauler East crew. They'll shortly be bring-
        
        
          ing their train out of Deschutes staging (lower deck
        
        
          beyond them) into Redland for a block swap before
        
        
          proceeding to Pocatello.
        
        
        
        
          MRH-Mar 2013