 
          Fort Wayne Union Railway - 
        
        
        
          
            2
          
        
        
          
            Designing the layout
          
        
        
          With this brief prototype history, I chose to proto-lance a small
        
        
          switching layout as my entry into the MRH design challenge.
        
        
          Given the limitations on money forces one to think about what
        
        
          you should spend the funds on and what to ignore. I view this
        
        
          layout as a section that can be further expanded in the future. I
        
        
          have also made the assumptions:
        
        
          1. The modeler has had some previous experience as a youth
        
        
          building models or model railroading
        
        
          2. The modeler has limited space available at the present time
        
        
          3. The layout must be expandable in the future.
        
        
          THE FORT WAYNE UNION RAILWAY Track Plan
        
        
          MRH-Jan 2013